Measuring Up: Quality Standards for Sewn Items/Projects
The purpose of this publication is to list and describe specific characteristics that can be expected in high-quality construction of either home-sewn or ready-to-wear garments or other sewn items. Th …
Hurry! Only left in stock.
Related publications
-
4-H Display Card 6 x 6 (pad of 25)
6 x 6 in. A pad of 25 white and green cards. ...
- Revised:
- August 2010
- SKU:
- C0632
-
4-H Entry and Claim Tag
Perforated tags, each printed with an individual number, 2.75 x 5.75 in. Pads of 25. Used to help identify and claim 4-H fair entries.
-
4-H Dressage Manual
This publication briefly introduces the concept of dressage, terminology, levels of competition, how to ride a test, how the test will be judged, and equipment and general rules used in competitions.
- Pages:
- 27
- Published:
- January 2009
- SKU:
- PNW608
-
4-H Cat Project, Unit One
This manual shows the new 4-H Cat Project member how to care for a cat. It also contains pictures of different cat breeds. Some of the topics include, but are not limited to: bringing home…
- Revised:
- August 2013
- Reviewed:
- July 2015
- SKU:
- EM4809E
