Measuring Up: Quality Standards for Sewn Items/Projects
The purpose of this publication is to list and describe specific characteristics that can be expected in high-quality construction of either home-sewn or ready-to-wear garments or other sewn items. Th …
Hurry! Only left in stock.
Related publications
-
-
4-H Dressage Manual
This publication briefly introduces the concept of dressage, terminology, levels of competition, how to ride a test, how the test will be judged, and equipment and general rules used in competitions.
- Pages:
- 27
- Published:
- January 2009
- SKU:
- PNW608
-
4-H Flower Arrangement Exhibit Scorecard
This scorecard is to be used in floral, gardening, plant science, or expressive art departments for the evaluation of flower arrangements. Judges have the option of either a numerical score or using t ...
- Published:
- July 2013
- SKU:
- C1124E
Authors: -
4-H Dairy Certificate
A form used to certify identification and ownership of 4-H project dairy cattle. Includes place to draw cow's identifiable markings, instructions, and signature lines. ...
- Reviewed:
- November 2014
- Reprinted:
- August 2002
- SKU:
- C0234E
