Measuring Up: Quality Standards for Sewn Items/Projects
The purpose of this publication is to list and describe specific characteristics that can be expected in high-quality construction of either home-sewn or ready-to-wear garments or other sewn items. Th …
Hurry! Only left in stock.
Related publications
-
4-H Flower Arrangement Exhibit Scorecard
This scorecard is to be used in floral, gardening, plant science, or expressive art departments for the evaluation of flower arrangements. Judges have the option of either a numerical score or using t ...
- Published:
- July 2013
- SKU:
- C1124E
Authors: -
4-H Entry and Claim Tag
Perforated tags, each printed with an individual number, 2.75 x 5.75 in. Pads of 25. Used to help identify and claim 4-H fair entries.
-
4-H Cat Project Unit 2
A 4-H member will progress to this manual upon successful completion of Unit One. This manual's subjects include: cat origins, breeds, and characteristics; how to select a cat or kitten; feeding, nutr ...
- Pages:
- 68
- Revised:
- August 2013
- SKU:
- EM4900E
Authors: -
4-H Cavy Project - Leader Guide
The 4-H Cavy Project is an animal science curriculum for youth in grades K through twelve. It consists of the curriculum introduction, cavy project information, and experintial (hands-on) activities. ...
- Pages:
- 112
- SKU:
- PNW573E
Authors:
