Measuring Up: Quality Standards for Sewn Items/Projects
The purpose of this publication is to list and describe specific characteristics that can be expected in high-quality construction of either home-sewn or ready-to-wear garments or other sewn items. Th …
Hurry! Only left in stock.
somdn_product_page
SKU: PNW197
Categories: 4-H, Projects and Publications
Related publications
-
4-H External Egg Scorecard
This scorecard is to be used in poultry or still-life departments. It may be used for chicken, duck, geese or eggs from other poultry/fowl. Number of eggs entered to be determined by each fair’s pr…
- Published:
- May 2013
- SKU:
- C1128E
Authors:somdn_product_page -
4-H Entry and Claim Tag
Perforated tags, each printed with an individual number, 2.75 x 5.75 in. Pads of 25. Used to help identify and claim 4-H fair entries.
-
4-H Archery Record
↑ Back to top
- Published:
- August 2008
- Reviewed:
- November 2014
- SKU:
- C1110E
somdn_product_page -
